PWT Expands Helena Office

PWT’s Montana office has moved to 54 North Last Chance Gulch, Helena, to accommodate three new employees … (More)

PWT Wins GSA, Fort Carson Contracts

PWT, as a team member with prime contractor the Arcanum Group, was awarded a five-year contract to … (More)

Pacific Western Technologies, LTD | Contact Us

Contact Us

Main Phone:  303.274.5400

  1. Contact Us
  2. (required)
  3. (valid email required)
  4. (required)
 

cforms contact form by delicious:days

Visit us at our Headquarters Office:

Pacific Western Technologies, Ltd.
11049 West 44th Avenue
Wheat Ridge, CO 80033

    Featured Case Study:

    Arsenal published paper

    Innovative Cover Design Construction Completed Successfully

    Much of the remediation at RMA is clean-up and on-site disposal of hazardous waste.  In the U.S. there are strict requirements for how that waste is disposed and covered. Methods that use synthetic covers have been the accepted standard, but at RMA an innovative alternative cover system was developed by the Army, with detailed involvement by EPA including engineering support and technical analysis … (More)

    California Gulch OU11

    California Gulch- OU 11 Superfund Site

    Leadville, Colorado: PWT used value engineering and sustainable design to remediate toxic metal-contaminated soils in former mining sites near Leadville, Colorado. In operable unit 11 of the site, PWT managed an innovative environmental remediation project to treat and re-vegetate 150 acres of irrigated meadows pastureland and 18 acres of fluvial deposits that bordered approximately 3,000 feet … (More)